News & Announcements
Huruma Village - Construction Phase II
24th January 2011
With the weir complete, the pumps are installed and piped to the source water

Completed weir showing pipes to supply water to the pumps.
To ensure the pumps are protected, should the stream flood, the pumps are secured to the bedrock and a steel cage is placed around them.

Pumps secured to the bedrock in the river.
The three MECKOW Aquapur units are connected to the header tanks, which then supply the bulk storage tanks with SAFE drinking water. A water collection point is installed providing four taps from where the community collect their drinking water requirements.

MECKOW Aquapur units installed, connected and ready to supply SAFE drinking water.
