jump to content

MECKOW EPA20

a simple solution
to a complex problem

MECKOW EPA20 Case Study

Luanda Province - Angola

MECKOW EPA20 Water Treatment Plant installed in Angola

During 2007 there was a requirement for the Supply of a Potable Water Treatment Plant in Bita Campo – Viana Municipality, Luande Province and the MECKOW EPA20 fulfilled all the requirements stipulated. The requirements of the Customer were the unit needed to be compact, easily maintained and with a capacity of 20 m3/h.

Along with the supply of the Water Treatment Plant came the installation, commissioning and training of the local operators, thus helping to build capacity on territory. The operation of the MECKOW EPA20 was supervised for a period of one year to ensure the local team, in charge of the daily operation of the unit were fully conversed in the running and maintenance.

This plant has been running successfully since November 2007 providing safe, clean drinking water for the local community.

Kylunda, Funda Municipality

MECKOW EPA20 Water Treatment Plant installed in Funda Municipality

This project was for the Supply, Installation and Commissioning of the compact Potable Water Treatment Plant (MECKOW EPA20) with a capacity of 20 m3/h.

Not only did this municipality require the assembly of the MECKOW EPA20 but also the transportation of the water from its source at the Bengo River (including installation of the pump and electrical connections) and the distribution system.

Once again training took place locally to ensure the team in charge of the operation of the MECKOW EPA20 fully understood how to run the plant.

This plant has been operating successfully since June 2008.

Latest News

20th Feb 2013

The hospital was built by Shell Petroleum Development Company (SPDC) in 1998 and donated to the community. Water supply has been from the borehole drilled within the hospital complex.
Read more...

15th Dec 2012

During December 2012 and inspection was carried out on the installation of the MECKOW Aquapur water purification unit at a private residential development in Lekkie, Lagos, Nigeria.
Read more...

13th Dec 2012

During December 2012, Andrew Kluckow of Meckow International, carried out and inspection of the Project in Ovade village in Delta State, Nigeria. The Project was financed by a Major Corporate on their CSR Program and is ready to handed over to the community.
Read more...